Facilities Diagram

Roll over image to zoom

1) Two cranes to unload solid bulk, connected to the conveyor system. Yield: 750 ton/hr each.
2) Crane copper concentrate shipment, connected to the conveyor system. Yield: 800 ton/hr .
3) Offices.
4) Uncovered gathering for concentrates : 40,000 tons.
5) Warehouse for copper concentrate: 55,000 tons.
6) Dome for clinker and cement: 45.000 tons.

7) Warehouse storage of concentrates: 6,000 tons.
8) Acid duct: shipment of sulfuric acid (H2SO4).
9) Warehouse for copper concentrate: 30,000 tons.
10) Coal court AES Gener.
11) Warehouse grain and general cargo: 10,000 tons.
12) Maneuvers railway station.
13) Grains warehouse : 45,000 tons.
14) Custom and SAG offices.
15) Uncovered yard for general cargo: 30,000 m2.

16) Coke yard (ENAP): 80,000 tons.
17) Grinding plant Cemento Melón.
18) Marine fuel terminal: 100,000 tons.
19) Asphalt terminal: 50,000 tons.
20) Mini oil tanker ship 3,000 tons. PACSA I.
21) Mini oil tanker ship 3,000 tons. PACSA II.
22) Warehouse for copper concentrate: 60,000 tons. (In construction).
23) Uncovered asphalt court: 6.640 m2.